Celair Profile Series Manual de instalación Pagina 19

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 18
Installation Instructions
4.0 Connections
Profile
Drill a 50mm (2”) hole in the dropper to bring the service lead and
controller cable into the ceiling space. The rubber grommet fitted to the
service lead is used to seal the hole in the dropper from the inside.
Connect the controller and solenoid cables into the control box. Refer to
Controller installation and commissioning instructions
Plug the pre-wired service lead into the GPO.
Electrical leads must not be draped over the fan deck or loosely
around the unit and must be fastened securely.
4.4.3. Wiring Diagram
Page 19
Vista de pagina 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24

Comentarios a estos manuales

Sin comentarios