Celair Profile Series Manual de instalación Pagina 20

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 19
Installation Instructions
5.0 Commissioning
Profile
5. COMMISSIONING
5.1. Water Levels
5.1.1. Turn water on to unit and allow unit to fill. The water should be 30 to 35mm
from the top of the overflow.
5.1.2. If an Enviroflow Water Conservation System is fitted, turn the unit on and set
the pre-cool function. This will activate the solenoid valve and allow time to
check the float valve setting.
5.1.3. Adjusting the float valve arm: while the float valve arm is factory set some
adjustment may be required. Adjust with care.
5.1.4. Fit Louvre panels and check for even wetting of the filter medium.
5.2. Dialflo Settings
5.2.1. Filter Rate – Outer Knob
Ensure the filter knob is opened
to get water flow to the
distributor. Turn Filter anti
clockwise to increase water flow.
If water lift off is noticed, the flow
rate can be adjusted. Turn anti
clockwise to reduce the flow to
the distributor.
5.2.2. Bleed-off Rate – Inner Knob
Always set the bleed rate after the
flow rate has been determined.
To set the bleed rate, hold the filter
flow knob at its current setting while
adjusting the bleed rate.
All evaporative air conditioners need some water bleed-off to prevent build-up
of mineral deposits in the system. The correct setting of the bleed rate will
ultimately govern the life of the unit.
Page 20
Vista de pagina 19
1 2 ... 15 16 17 18 19 20 21 22 23 24

Comentarios a estos manuales

Sin comentarios